Work continues on the hardwoods (picture #1), particularly the tricky part of wrapping the sections of tile around the hearth (picture #2) and side entry (picture #3) and then matching the lines up in the hallway to parallel the wall with the closets relatively close. Ended up running different widths on the west side vs. the east side as the widths were about 3/4" off between the two (picture #4 from the laundry room).
It seems to be going a bit easier now but its taken a good bit of time and dry fitting to make sure all of the joints match up as we had to do some custom milling on quite a few of the pieces. If you compare the pictures from last week to this week you can see where we had to fit in several just to the left of the picture by the wood burning stove.
Also got most of the trim milled up and stained to wrap the structural beam in the game room but its still sitting down in the garage waiting to be installed (more pictures of that later).